Project Clivedale

Completed

2018

This project involved the refurbishment of Clivedale headquarters and show suite. Works delivered include the design, installation and commissioning of the KNX lighting control systems, LF first fix cabling installation and second fixing of accessories, and ELV Data and Audio Visual infrastructure cabling. The attention to detail in both design and workmanship resulted in an extraordinary finish.

Works

Design, install and commissioning of the KNX lighting control systems LV first fix cabling install and second fixing of accessories ELV Data and Audio Visual infrastructure cabling.

Virgin Media/O2 recently employed TMES to complete a complex upgrade of the UPS infrastructure at our crucial business site in Northampton. Work involved the redesign and removal of existing UPS equipment followed by the installation of new 800kVA N+N plant. A highly challenging piece of work that the TMES team diligently carried out, working closely with our design consultant and onsite technical team. The outcome has been a first-class installation with no interruption to business operations, delivered on programme and within budget. Looking forward to working with TMES on future projects.

Ian Smithies
Technical Site Engineering and Delivery for Virgin Media/O2

TMES have performed exceptionally well at our recent project in Camden Street, working with the Murphy team to complete the Mechanical works on a very difficult project with a challenging programme. The professionalism and diligence that they have shown in completing another contractors work, ensuring all systems are complete and commissioned in a limited period has been outstanding. It has been an absolute pleasure working with Nic, Toby and the team and we are very much looking forward to the next project with TMES.

Jennifer Croughton
Commercial Director, Construction and Specialist Businesses, for Murphy Group

I have previously worked with the TMES team on a range of projects from Commercial fitout through to data centre infrastructure installations and capital plant upgrades. They always strive to deliver a quality product in time and on budget, working with the end user to make sure the combined results are achieved.

Paul Hood
Managing Director for Yondr

TMES have been a pleasure to work with on the recent project at Northampton. This was a complicated UPS upgrade with multiple changes overs that were carried out diligently. A good management team making the project appear simple. Looking forward to next project together.

Darren Keenan
Director for Brentwood Group